WCSE 2017
ISBN: 978-981-11-3671-9 DOI: 10.18178/wcse.2017.06.194

Design and Realization of the Train Simulation Test System

Wanting Zhao, Xiangxian Chen, Zhujun Ling, Zhenpeng Nie, Wenbing Tang, Guodong Teng, Lanqing Hu

Abstract— CBTC system is the most popular system in rail transit signaling system. However, as it is the rail train as an object, it takes a lot resource to conduct the investigation under a real situation. Therefore, to develop a CBTC system in lab-based environment is essential. The carborne operation control system is a central system of rail transit control system. It is of most important to protect the safety of the rail train. Therefore, the safety and reality of the carborne operation control system directly influent the whole system’s operation and the safety and the efficiency of the train. The current study is focusing on the design and the investigation of the carborne operation control system, which is the central system of the rail transit signaling system.

Index Terms— rail train transit, CBTC, Carborne, control, simulation

Wanting Zhao, Xiangxian Chen
Department of Instrumentation Science and Engineering, Zhejiang University, CHINA
Zhujun Ling, Zhenpeng Nie, Wenbing Tang, Guodong Teng, Lanqing Hu
Research and Development Center, Zhejiang United Science and Technology Co., Ltd, CHINA

ISBN: 978-981-11-3671-9 DOI: 10.18178/wcse.2017.06.17Xsrc="http://www.wcse.org/uploadfile/2019/0823/20190823055609629.png" style="width: 120px; height: 68px;" />[Download]


Cite: Wanting Zhao, Xiangxian Chen, Zhujun Ling, Zhenpeng Nie, Wenbing Tang, Guodong Teng, Lanqing Hu, "Design and Realization of the Train Simulation Test System," Proceedings of 2017 the 7th International Workshop on Computer Science and Engineering, pp. 1112-1116, Beijing, 25-27 June, 2017.